Discover Opportunities months before the RFP drops
Learn more →The project involves replacing 56 windows at Stubbs Hall, converting them to Storefront with black frames and spandrel glass. Includes field verification, watertight exterior finishes, and uniform interior finishes.
Posted Date
-
Due Date
-
Release: -
Close: -
The project involves replacing 56 windows at Stubbs Hall, converting them to Storefront with black frames and spandrel glass. Includes field verification, watertight exterior finishes, and uniform interior finishes.
AvailableRemoval and disposal of Plexi glass from a greenhouse that is approx. 400 SF. Using existing frame and fasteners, install 1/4" acid satin tempered glass on the ceiling and 1/4" opal twin wall polycarbonate on the walls, replacing weather stripping as needed.
Posted Date
Nov 6, 2025
Due Date
Nov 24, 2025
Release: Nov 6, 2025
Close: Nov 24, 2025
Removal and disposal of Plexi glass from a greenhouse that is approx. 400 SF. Using existing frame and fasteners, install 1/4" acid satin tempered glass on the ceiling and 1/4" opal twin wall polycarbonate on the walls, replacing weather stripping as needed.
Release: Oct 21, 2025
Close: Dec 2, 2025
Provide window replacement.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis