Learn more →Provide installation of 11,450 LF of 18" waterline and all appurtenances. 1 LS mobilization; 1 LS erosion control; 1 LS contractor construction staking; 1 LS clearing & grubbing; 3,321 LF 18" hdpe dips dr 9 waterline by trenching; 8,138 LF 18" hdpe dips dr 11 waterline by trenching; 30 LF 18" hdpe dips dr 9 waterline by boring; 9 EA air release valve; 3 EA blow off valve; 4 EA 18" gate valve; 2 EA 18"x12" tee; 2 EA 12" tapping sleeve & valve; 5 EA 18" 90º bend; 5 EA 18" 45º bend; 2 EA 18" 22. 5º bend; 1 EA 18" 11. 25º bend; 1 ea 18" plug; 3 EA connection to existing waterline; 1875 SF pavement repair/replacement (gravel); 100 SF pavement repair/replacement (asphalt); 1 LS allowance for work not shown on the plans or required by the specifications; 1 LS flushing, pressure testing, leakage testing, and disinfection of 18" hdpe water line, complete. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 11, 2025
Release: Nov 19, 2025
Close: Dec 11, 2025
Provide installation of 11,450 LF of 18" waterline and all appurtenances. 1 LS mobilization; 1 LS erosion control; 1 LS contractor construction staking; 1 LS clearing & grubbing; 3,321 LF 18" hdpe dips dr 9 waterline by trenching; 8,138 LF 18" hdpe dips dr 11 waterline by trenching; 30 LF 18" hdpe dips dr 9 waterline by boring; 9 EA air release valve; 3 EA blow off valve; 4 EA 18" gate valve; 2 EA 18"x12" tee; 2 EA 12" tapping sleeve & valve; 5 EA 18" 90º bend; 5 EA 18" 45º bend; 2 EA 18" 22. 5º bend; 1 EA 18" 11. 25º bend; 1 ea 18" plug; 3 EA connection to existing waterline; 1875 SF pavement repair/replacement (gravel); 100 SF pavement repair/replacement (asphalt); 1 LS allowance for work not shown on the plans or required by the specifications; 1 LS flushing, pressure testing, leakage testing, and disinfection of 18" hdpe water line, complete. See attached file.
Installation of tube settlers in each of the two rectangular clarifiers and removal/replacement of filter media in one 12' x 12' filter plus the addition of anthracite to remaining three filters.
Posted Date
Sep 29, 2025
Due Date
Oct 16, 2025
Release: Sep 29, 2025
Close: Oct 16, 2025
Installation of tube settlers in each of the two rectangular clarifiers and removal/replacement of filter media in one 12' x 12' filter plus the addition of anthracite to remaining three filters.
Construction of a 1-MG composite elevated storage tank.
Posted Date
Jun 26, 2025
Due Date
Jul 23, 2025
Release: Jun 26, 2025
Close: Jul 23, 2025
Construction of a 1-MG composite elevated storage tank.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis