Learn more →Procurement of labor and equipment for milling machine operations (uniform, variable, and full depth patch) in Cherokee County for the South Carolina Department of Transportation.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Procurement of labor and equipment for milling machine operations (uniform, variable, and full depth patch) in Cherokee County for the South Carolina Department of Transportation.
AvailableWork includes removal and disposal of existing pavement 107.000 SY, removal of exist guardrail 512.500 LF, unclassified excavation 28.000 CY, borrow excavation 3,455.600 CY, excavation for shoulder paving 1,025.200 STA, hauling of excavated shoulder material 1,025.200 STA, maintenance stone 92.100 Ton, cement modified recycled base (10" unif) curing method b 77,025.000 SY, portland cement for cement modified recycled base course 2,078.000 Ton, hma shoulder widening course 5,447.200 Ton, liquid asphalt binder pg64-22 2,400.799 Ton, full depth asph pav patching 6" unif 3,460.000 SY. See attached file.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Work includes removal and disposal of existing pavement 107.000 SY, removal of exist guardrail 512.500 LF, unclassified excavation 28.000 CY, borrow excavation 3,455.600 CY, excavation for shoulder paving 1,025.200 STA, hauling of excavated shoulder material 1,025.200 STA, maintenance stone 92.100 Ton, cement modified recycled base (10" unif) curing method b 77,025.000 SY, portland cement for cement modified recycled base course 2,078.000 Ton, hma shoulder widening course 5,447.200 Ton, liquid asphalt binder pg64-22 2,400.799 Ton, full depth asph pav patching 6" unif 3,460.000 SY. See attached file.
AvailableWork includes removal of exist guardrail 100.000 LF, unclassified excavation 243.000 CY, borrow excavation 1,653.500 CY, additional rock for full depth reclamation 607.500 Ton, maintenance stone 26.289 Ton, cement modified recycled base (10" unif) curing method b 35, 012.270 SY, portland cement for cement modified recycled base course 1,225.430 Ton, liquid asphalt binder pg64-22 509.127 Ton, full depth asph pav patching 4" unif 983.680 SY, full depth asph pav patching 6" unif 1,378.220 SY, full depth asph pav patching 8" unif 267.000 SY, surface plane asphalt pavement 1.0" 315.000 SY. See attached file.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Work includes removal of exist guardrail 100.000 LF, unclassified excavation 243.000 CY, borrow excavation 1,653.500 CY, additional rock for full depth reclamation 607.500 Ton, maintenance stone 26.289 Ton, cement modified recycled base (10" unif) curing method b 35, 012.270 SY, portland cement for cement modified recycled base course 1,225.430 Ton, liquid asphalt binder pg64-22 509.127 Ton, full depth asph pav patching 4" unif 983.680 SY, full depth asph pav patching 6" unif 1,378.220 SY, full depth asph pav patching 8" unif 267.000 SY, surface plane asphalt pavement 1.0" 315.000 SY. See attached file.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis