Discover Opportunities months before the RFP drops
Learn more →Hydraulic Dredging approximately 310,000 cubic yards of sediment from Bancroft Channel and East Main Bay of Fountain Lake, and potentially an addition of 240,000 cubic yards of sediment from North (Bancroft) Bay (approximately 550,000 cubic yards total), inclusive of pipeline transport, placement of Dredge material at constructed upland confined disposal facility (CDF) and operation and maintenance of the CDF for the life of the Contract.
Posted Date
Nov 24, 2025
Due Date
Jan 16, 2026
Release: Nov 24, 2025
Close: Jan 16, 2026
Hydraulic Dredging approximately 310,000 cubic yards of sediment from Bancroft Channel and East Main Bay of Fountain Lake, and potentially an addition of 240,000 cubic yards of sediment from North (Bancroft) Bay (approximately 550,000 cubic yards total), inclusive of pipeline transport, placement of Dredge material at constructed upland confined disposal facility (CDF) and operation and maintenance of the CDF for the life of the Contract.
AvailableConstructing several wetlands on district property. Work involves modifications to subsurface drainage infrastructure, sediment removal/grading, berm construction, installation of culvert and outfall structure, and site restoration of approximately 150 acres in a previously cultivated field. The work includes, but is not limited to, mobilization and demobilization; furnishing, installing, and maintaining erosion control measures, clearing and grubbing, site restoration including preparation for seeding, removal of segments of drain tile, re-routing and installing new drain tile, grading and sediment removal, riprap installation, construction of wetland berms, and installation of culvert and outfall structure. Also included is installation of erosion control blanket, mulching, performing site cleanup.
Posted Date
Nov 12, 2025
Due Date
Dec 1, 2025
Release: Nov 12, 2025
Close: Dec 1, 2025
Constructing several wetlands on district property. Work involves modifications to subsurface drainage infrastructure, sediment removal/grading, berm construction, installation of culvert and outfall structure, and site restoration of approximately 150 acres in a previously cultivated field. The work includes, but is not limited to, mobilization and demobilization; furnishing, installing, and maintaining erosion control measures, clearing and grubbing, site restoration including preparation for seeding, removal of segments of drain tile, re-routing and installing new drain tile, grading and sediment removal, riprap installation, construction of wetland berms, and installation of culvert and outfall structure. Also included is installation of erosion control blanket, mulching, performing site cleanup.
Release: Jul 12, 2024
Close: Aug 2, 2024
Wetland restoration.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis