Discover Opportunities months before the RFP drops
Learn more →1. 1 special counsel, 1. 2 special counsel, litigation, 1. 3 town auditor, 1. 4 tax appeal attorney, 1. 5 labor attorney, 1. 6 consulting engineer, 1. 7 town surveyor, 1. 8 bond counsel, 1. 9 special bond counsel, 1. 10 real property appraiser, 1. 11 alcoholic beverage control board counsel, 1. 12 public relations specialist/ grant writer, 1. 13 municipal prosecutor, 1. 14 planning board attorney, 1. 15 zoning board of adjustment attorney, 1. 16 municipal public defender, 1. 17 town architect, 1. 18 planner, 1. 19 town veterinarian, 1. 20 environmental consultant, 1. 21 secaucus board of health attorney.
Posted Date
Dec 11, 2025
Due Date
Jan 9, 2026
Release: Dec 11, 2025
Close: Jan 9, 2026
1. 1 special counsel, 1. 2 special counsel, litigation, 1. 3 town auditor, 1. 4 tax appeal attorney, 1. 5 labor attorney, 1. 6 consulting engineer, 1. 7 town surveyor, 1. 8 bond counsel, 1. 9 special bond counsel, 1. 10 real property appraiser, 1. 11 alcoholic beverage control board counsel, 1. 12 public relations specialist/ grant writer, 1. 13 municipal prosecutor, 1. 14 planning board attorney, 1. 15 zoning board of adjustment attorney, 1. 16 municipal public defender, 1. 17 town architect, 1. 18 planner, 1. 19 town veterinarian, 1. 20 environmental consultant, 1. 21 secaucus board of health attorney.
AvailableProvide interim executive director and related consulting services.
Posted Date
Nov 12, 2025
Due Date
Nov 25, 2025
Release: Nov 12, 2025
Close: Nov 25, 2025
Provide interim executive director and related consulting services.
Work includes 5,150 SY of hma milling & overlay, 150 SY of hot mix asphalt pavement repair; 10 CY of excavation; concrete curb, replacement catch basins, 678 SY of concrete sidewalk, 4" thick; 175 SY of concrete driveway, reinforced, 6" thick; 1,600 LF of 9" x 18" concrete vertical curb; 1,523 LF of traffic markings lines, 6"; 800 LF of curb paint, (yellow); 300 SY of fertilizing and seeding, type a-3; 3,000 LF of sealing existing joints in concrete pavement; 210 SF of decorative crosswalk; installation of ada curb ramps, removal of trees, and restoration.
Posted Date
Oct 3, 2025
Due Date
Oct 21, 2025
Release: Oct 3, 2025
Close: Oct 21, 2025
Work includes 5,150 SY of hma milling & overlay, 150 SY of hot mix asphalt pavement repair; 10 CY of excavation; concrete curb, replacement catch basins, 678 SY of concrete sidewalk, 4" thick; 175 SY of concrete driveway, reinforced, 6" thick; 1,600 LF of 9" x 18" concrete vertical curb; 1,523 LF of traffic markings lines, 6"; 800 LF of curb paint, (yellow); 300 SY of fertilizing and seeding, type a-3; 3,000 LF of sealing existing joints in concrete pavement; 210 SF of decorative crosswalk; installation of ada curb ramps, removal of trees, and restoration.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis