Discover Opportunities months before the RFP drops
Learn more →1. Multi-purpose building: restroom conversion of portion of multi-purpose building. A. Girls andboys restroom b. Women's and men's staff restroom this project does not involve: 1. Grading/drainage - project area is a a. Existing area conforms to accessibility requirements 2. No modifications to landscaping / parking / paving.
Posted Date
Oct 14, 2025
Due Date
Jan 6, 2026
Release: Oct 14, 2025
Close: Jan 6, 2026
1. Multi-purpose building: restroom conversion of portion of multi-purpose building. A. Girls andboys restroom b. Women's and men's staff restroom this project does not involve: 1. Grading/drainage - project area is a a. Existing area conforms to accessibility requirements 2. No modifications to landscaping / parking / paving.
AvailableThe project generally consists of improvements to an existing school campus consisting of: Remove existing chain link, sleeve new line posts over existing galvanized line posts where possible, grout and/or button weld new post to existing. Seal weld with rubberized matching black paint. Install new 1", black, vinyl coated mesh, including top and bottom rails as noted in contract documents.
Posted Date
Oct 14, 2025
Due Date
Nov 5, 2025
Release: Oct 14, 2025
Close: Nov 5, 2025
The project generally consists of improvements to an existing school campus consisting of: Remove existing chain link, sleeve new line posts over existing galvanized line posts where possible, grout and/or button weld new post to existing. Seal weld with rubberized matching black paint. Install new 1", black, vinyl coated mesh, including top and bottom rails as noted in contract documents.
Construction of new girls and boys, (2) staff restrooms and utility room in existing multi-purpose building. Work includes, remodel of existing building to construct restrooms for students and staff, demolition of existing flooring and base, electrical items, wall mounted speaker, tv monitor and mount, electrical control cabinet, portable ahu, and existing portable storage cabinet, construction of (2) new accessible staff toilet rooms, (1) boys restroom with 3 water closets, (1) girls restroom with (3) water closets, installation of plumbing fixtures and accessories, and all applicable mechanical, electrical, and plumbing related work.
Posted Date
Oct 2, 2025
Due Date
Nov 4, 2025
Release: Oct 2, 2025
Close: Nov 4, 2025
Construction of new girls and boys, (2) staff restrooms and utility room in existing multi-purpose building. Work includes, remodel of existing building to construct restrooms for students and staff, demolition of existing flooring and base, electrical items, wall mounted speaker, tv monitor and mount, electrical control cabinet, portable ahu, and existing portable storage cabinet, construction of (2) new accessible staff toilet rooms, (1) boys restroom with 3 water closets, (1) girls restroom with (3) water closets, installation of plumbing fixtures and accessories, and all applicable mechanical, electrical, and plumbing related work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis