Discover Opportunities months before the RFP drops
Learn more →Provide armed security services.
Posted Date
Dec 15, 2025
Due Date
Dec 29, 2025
Release: Dec 15, 2025
Close: Dec 29, 2025
Provide armed security services.
AvailableFurnish and install an emergency diesel generator at the water system lift station. The generator is to be placed on properly size concrete pad meeting required manufacturer specifications. The minimum specifications needed for sufficient capacity to handle the total power demand of the water system are 200KW/60Hertz @ 1,800RPM. This specific capacity will ensure the new generator is compatible with the existing electrical system and controls. Retrofitting the system to accommodate the new generator, including wiring, controls, and fuel lines will also be performed.
Posted Date
Dec 11, 2025
Due Date
Jan 12, 2026
Release: Dec 11, 2025
Close: Jan 12, 2026
Furnish and install an emergency diesel generator at the water system lift station. The generator is to be placed on properly size concrete pad meeting required manufacturer specifications. The minimum specifications needed for sufficient capacity to handle the total power demand of the water system are 200KW/60Hertz @ 1,800RPM. This specific capacity will ensure the new generator is compatible with the existing electrical system and controls. Retrofitting the system to accommodate the new generator, including wiring, controls, and fuel lines will also be performed.
AvailableFurnishing and installation of an emergency diesel generator. The generator is to be placed on properly size concrete pad meeting required manufacturer specifications. The minimum specifications needed for sufficient capacity to handle the total power demand of the water system are 60KW/75 @1,800RPM. This specific capacity will ensure the new generator is compatible with the existing electrical system and controls. Retrofitting the system to accommodate the new generator, including wiring, controls, and fuel lines will also be performed.
Posted Date
Dec 11, 2025
Due Date
Jan 12, 2026
Release: Dec 11, 2025
Close: Jan 12, 2026
Furnishing and installation of an emergency diesel generator. The generator is to be placed on properly size concrete pad meeting required manufacturer specifications. The minimum specifications needed for sufficient capacity to handle the total power demand of the water system are 60KW/75 @1,800RPM. This specific capacity will ensure the new generator is compatible with the existing electrical system and controls. Retrofitting the system to accommodate the new generator, including wiring, controls, and fuel lines will also be performed.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis