Discover Opportunities months before the RFP drops
Learn more →The project consists of complete preparation and installation of the infield playing surface, including grading, base material placement, soil conditioning, and the application of infield mix. Work shall also include installation of pitcher's mound, home plate area, bases, and transition areas.
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Close: Dec 19, 2025
The project consists of complete preparation and installation of the infield playing surface, including grading, base material placement, soil conditioning, and the application of infield mix. Work shall also include installation of pitcher's mound, home plate area, bases, and transition areas.
AvailableThe fence will be 4 FT high starting from each dugout and continuing around the entire outfield. On both the right and left sides of the field, the fence will extend 100 FT from each dugout, leaving an open space closer to the right and left foul lines. The gates next to each dugout will also be 4 FT high. The distance from home plate to both the right and left foul lines is 210 FT. The distance from the center of the pitching rubber to the center-field fence is 172 FT. Remove the center-field gate. Remove the gates next to the right and left foul poles and replace with 21’ of 4’ fencing.
Posted Date
Oct 1, 2025
Due Date
Oct 7, 2025
Release: Oct 1, 2025
Close: Oct 7, 2025
The fence will be 4 FT high starting from each dugout and continuing around the entire outfield. On both the right and left sides of the field, the fence will extend 100 FT from each dugout, leaving an open space closer to the right and left foul lines. The gates next to each dugout will also be 4 FT high. The distance from home plate to both the right and left foul lines is 210 FT. The distance from the center of the pitching rubber to the center-field fence is 172 FT. Remove the center-field gate. Remove the gates next to the right and left foul poles and replace with 21’ of 4’ fencing.
Work includes remove or relocate existing structures, prepare groundwork, grade area, install irrigation systems, install fencing and other tasks necessary to construct a softball field.
Posted Date
Nov 19, 2024
Due Date
Dec 12, 2024
Release: Nov 19, 2024
Close: Dec 12, 2024
Work includes remove or relocate existing structures, prepare groundwork, grade area, install irrigation systems, install fencing and other tasks necessary to construct a softball field.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis