Discover Opportunities months before the RFP drops
Learn more →Project consists of: removal of existing site improvements (landscaping and play equipment). Replacement of existing concrete walkways. Removal of portions of the existing chain-link fencing and installation of new chain-link fencing. Sitework, utility installations, and final utility connections for the installation of a new owner-furnished owner-installed permanent modular building. Installation of new concrete paving, landscaping and irrigation systems. Installation of new fire alarm and low-voltage systems within the modular building.
Posted Date
May 7, 2025
Due Date
Jun 10, 2025
Release: May 7, 2025
Close: Jun 10, 2025
Project consists of: removal of existing site improvements (landscaping and play equipment). Replacement of existing concrete walkways. Removal of portions of the existing chain-link fencing and installation of new chain-link fencing. Sitework, utility installations, and final utility connections for the installation of a new owner-furnished owner-installed permanent modular building. Installation of new concrete paving, landscaping and irrigation systems. Installation of new fire alarm and low-voltage systems within the modular building.
Provide 13 EA Cisco 48 port switch; 13 EA Cisco 8 x 10 network module; 13 EA Cisco DNA Advantage 5 year; 13 EA Cisco Network Advantage 48 port license; 13 EA North America AC Type A Power Cable. See outside link.
Posted Date
Feb 14, 2025
Due Date
Mar 14, 2025
Release: Feb 14, 2025
Close: Mar 14, 2025
Provide 13 EA Cisco 48 port switch; 13 EA Cisco 8 x 10 network module; 13 EA Cisco DNA Advantage 5 year; 13 EA Cisco Network Advantage 48 port license; 13 EA North America AC Type A Power Cable. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis