Discover Opportunities months before the RFP drops
Learn more →Work construction of a new fire station. Three bay fire station to include, but not limited to, office areas, kitchen area, bathrooms with walk in shower, storage area, paving, plumbing, electrical, HVAC, necessary dirt work, flooring, cabinets, fixtures as needed, etc. Approximately 7050 SF under roof & 12,460 SF concrete including driveways.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Work construction of a new fire station. Three bay fire station to include, but not limited to, office areas, kitchen area, bathrooms with walk in shower, storage area, paving, plumbing, electrical, HVAC, necessary dirt work, flooring, cabinets, fixtures as needed, etc. Approximately 7050 SF under roof & 12,460 SF concrete including driveways.
AvailableConcrete Work at a building. This will be approximately 80 yds of 4500 psi 6" thick concrete (Approx.. 4,600 SF); #4 rebar on 18" centers; install 150 ft. of culvert with drainage box on each end; demo/removal of existing paving/culvert, labor and clean up.
Posted Date
-
Due Date
Mar 18, 2025
Release: -
Close: Mar 18, 2025
Concrete Work at a building. This will be approximately 80 yds of 4500 psi 6" thick concrete (Approx.. 4,600 SF); #4 rebar on 18" centers; install 150 ft. of culvert with drainage box on each end; demo/removal of existing paving/culvert, labor and clean up.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis