Learn more →Release: Oct 23, 2025
Close: Jan 16, 2026
Resurfacing roads.
AvailableWork includes inspection of all highway bridges.
Posted Date
Oct 14, 2025
Due Date
Nov 26, 2025
Release: Oct 14, 2025
Close: Nov 26, 2025
Work includes inspection of all highway bridges.
The project consists of infrastructure work for public safety communications. Work will occur at two sites. Each site will consist of a 32' x 36' compound that contains a three- legged, 180' tall public safety communication tower, an equipment shelter (provided by others), a diesel-fired generator, an electrical transformer, and an electrical service disconnect switch. Each compound will be surfaced in gravel and accessed by a gravel drive. The foundation for each tower will consist of three concrete piers, extending into the ground and onto a reinforced concrete mat foundation. The shelters, generators, and transformers will have concrete bases. Each compound will be enclosed with a chain link fence with barbed wire along the top. Trade Package 26: Electrical; Trade Package 31: Earthwork and Concrete; Trade Package 32F: Chain Link Fence; Trade Package 35TL: Self-Supported Tower (Labor Only); Trade Package 35TM: Self-Supported Tower (Material Only.
Posted Date
May 27, 2025
Due Date
Jul 7, 2025
Release: May 27, 2025
Close: Jul 7, 2025
The project consists of infrastructure work for public safety communications. Work will occur at two sites. Each site will consist of a 32' x 36' compound that contains a three- legged, 180' tall public safety communication tower, an equipment shelter (provided by others), a diesel-fired generator, an electrical transformer, and an electrical service disconnect switch. Each compound will be surfaced in gravel and accessed by a gravel drive. The foundation for each tower will consist of three concrete piers, extending into the ground and onto a reinforced concrete mat foundation. The shelters, generators, and transformers will have concrete bases. Each compound will be enclosed with a chain link fence with barbed wire along the top. Trade Package 26: Electrical; Trade Package 31: Earthwork and Concrete; Trade Package 32F: Chain Link Fence; Trade Package 35TL: Self-Supported Tower (Labor Only); Trade Package 35TM: Self-Supported Tower (Material Only.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis