Discover Opportunities months before the RFP drops
Learn more →Work includes demolition of the interior of the existing building, rom the inside face of exterior structural cmu to inside face of exterior structural cmu. From surface of existing concrete slab to existing structural roof systems. Exterior demolition should include all existing stucco down to the existing outside face of cmu. See attached file.
Posted Date
Oct 25, 2024
Due Date
Nov 21, 2024
Release: Oct 25, 2024
Close: Nov 21, 2024
Work includes demolition of the interior of the existing building, rom the inside face of exterior structural cmu to inside face of exterior structural cmu. From surface of existing concrete slab to existing structural roof systems. Exterior demolition should include all existing stucco down to the existing outside face of cmu. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis