Discover Opportunities months before the RFP drops
Learn more →The Port of Iberia District Board of Commissioners seeks proposals for heavy construction work involving interior dredging and barge gate maintenance at the Freshwater Bayou Bypass Channel. The project includes mobilization, construction layout, surveying, gate repairs, and dredging. Estimated cost is $2,000,000. Proposals require a 5% bid guaranty.
Posted Date
Nov 19, 2025
Due Date
Dec 16, 2025
Release: Nov 19, 2025
Close: Dec 16, 2025
The Port of Iberia District Board of Commissioners seeks proposals for heavy construction work involving interior dredging and barge gate maintenance at the Freshwater Bayou Bypass Channel. The project includes mobilization, construction layout, surveying, gate repairs, and dredging. Estimated cost is $2,000,000. Proposals require a 5% bid guaranty.
AvailableProject consists of the construction of a new steel bulkhead structure, installation of new mooring bollards, channel excavation, civil site work, and associated site improvements. All specified and incidental work required to support, connect, and complete construction activities, including site preparation, coordination, and final restoration, shall be performed to ensure successful completion of the project in full compliance with the contract documents.
Posted Date
Aug 13, 2025
Due Date
Sep 10, 2025
Release: Aug 13, 2025
Close: Sep 10, 2025
Project consists of the construction of a new steel bulkhead structure, installation of new mooring bollards, channel excavation, civil site work, and associated site improvements. All specified and incidental work required to support, connect, and complete construction activities, including site preparation, coordination, and final restoration, shall be performed to ensure successful completion of the project in full compliance with the contract documents.
Construction of the new Millennium Slip as an expansion of the existing slip identified as "Slip C-14". The Owner’s objective is to create a continuous waterway free of defects or obstructions by integrating the new Millennium Slip with the existing Slip C-14. Perform construction layout work, implement temporary erosion control, perform excavation and fill placement, and successfully execute all other specified and incidental work.
Posted Date
Aug 5, 2025
Due Date
Sep 10, 2025
Release: Aug 5, 2025
Close: Sep 10, 2025
Construction of the new Millennium Slip as an expansion of the existing slip identified as "Slip C-14". The Owner’s objective is to create a continuous waterway free of defects or obstructions by integrating the new Millennium Slip with the existing Slip C-14. Perform construction layout work, implement temporary erosion control, perform excavation and fill placement, and successfully execute all other specified and incidental work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis