Discover Opportunities months before the RFP drops
Learn more →Conduct a comprehensive subsurface investigation and survey in support of planned infrastructure improvements.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
Close: Dec 12, 2025
Conduct a comprehensive subsurface investigation and survey in support of planned infrastructure improvements.
Demolishing a 1,200 SF single-wide manufactured home on the reservation. The work includes the house, a travel trailer, and any remaining personal property including disposal.
Posted Date
Sep 12, 2025
Due Date
Sep 19, 2025
Release: Sep 12, 2025
Close: Sep 19, 2025
Demolishing a 1,200 SF single-wide manufactured home on the reservation. The work includes the house, a travel trailer, and any remaining personal property including disposal.
Install submersible well pump, 600 LF of water transmission line from wellhead to water treatment building, and connection to existing infrastructure. This project proposes to equip a new well and connect it to the Port Gamble S’Klallam Community Water System of the Port Gamble S'Klallam Tribe. The proposed work includes: Mobilization and Demobilization, Install Drop Pipe and Submersible Cable, Install Submersible Well Pump, Install Water Level Transducer, Install Transducer Conduit and Sounding Tube, Install Check Valves, Well Disinfection, Install Pitless Unit with Well Cap, Install Steel Bollards, Install Transmission Line, Install Electrical Cable and Transducer Cable, Install Combination Air Valve, Tie-In to Pump House Plumbing Tree, Connection to Existing Pump Control Panel includes 220 LF 1.25" PVC transducer conduit and sounding tube, 610 LF 4" ductile iron water transmission line, 610 LF pump electrical cable and transducer cable.
Posted Date
Jun 16, 2025
Due Date
Jul 1, 2025
Release: Jun 16, 2025
Close: Jul 1, 2025
Install submersible well pump, 600 LF of water transmission line from wellhead to water treatment building, and connection to existing infrastructure. This project proposes to equip a new well and connect it to the Port Gamble S’Klallam Community Water System of the Port Gamble S'Klallam Tribe. The proposed work includes: Mobilization and Demobilization, Install Drop Pipe and Submersible Cable, Install Submersible Well Pump, Install Water Level Transducer, Install Transducer Conduit and Sounding Tube, Install Check Valves, Well Disinfection, Install Pitless Unit with Well Cap, Install Steel Bollards, Install Transmission Line, Install Electrical Cable and Transducer Cable, Install Combination Air Valve, Tie-In to Pump House Plumbing Tree, Connection to Existing Pump Control Panel includes 220 LF 1.25" PVC transducer conduit and sounding tube, 610 LF 4" ductile iron water transmission line, 610 LF pump electrical cable and transducer cable.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis