Discover Opportunities months before the RFP drops
Learn more →Construction of a partition wall with a bank teller style window, intercom, and doorbell in the clerk of the court s office. The wall will be built on top of the existing approx. 3 1/2" counter and end approx. 6" from the ceiling. The window will be 50" wide, and the door approx. 30" wide.
Posted Date
Sep 18, 2025
Due Date
Sep 26, 2025
Release: Sep 18, 2025
Close: Sep 26, 2025
Construction of a partition wall with a bank teller style window, intercom, and doorbell in the clerk of the court s office. The wall will be built on top of the existing approx. 3 1/2" counter and end approx. 6" from the ceiling. The window will be 50" wide, and the door approx. 30" wide.
Construction of a satellite Road and Bridge Storage Facility in the southeast area of the County. The components of the project include the construction of a 40’x52’x14’ building, the abandoning of an old well and the drilling of a new well, and the installation of a septic system.
Posted Date
Jan 16, 2025
Due Date
Jan 30, 2025
Release: Jan 16, 2025
Close: Jan 30, 2025
Construction of a satellite Road and Bridge Storage Facility in the southeast area of the County. The components of the project include the construction of a 40’x52’x14’ building, the abandoning of an old well and the drilling of a new well, and the installation of a septic system.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis