Discover Opportunities months before the RFP drops
Learn more →The Project consists of constructing approx Cold Milling Asphalt Concrete 1,000 SY, Asphalt Concrete Composite 113.0 Ton, 3'-10" Wide Deck x 23" Prestressed Concrete Double Tee 790 Ft, Concrete Penetrating Sealer 537.0 SY , Movable Concrete Barrier 40 Each, Bridge Repainting, Class I, Paint Residue Containment, Traffic Control, Erosion Control and other various bid items.
Posted Date
Oct 23, 2025
Due Date
Nov 5, 2025
Release: Oct 23, 2025
Close: Nov 5, 2025
The Project consists of constructing approx Cold Milling Asphalt Concrete 1,000 SY, Asphalt Concrete Composite 113.0 Ton, 3'-10" Wide Deck x 23" Prestressed Concrete Double Tee 790 Ft, Concrete Penetrating Sealer 537.0 SY , Movable Concrete Barrier 40 Each, Bridge Repainting, Class I, Paint Residue Containment, Traffic Control, Erosion Control and other various bid items.
The Project consists of constructing approx Base Course 52.6 Ton, Asphalt Concrete Composite 59.2 Ton, Concrete Removal Type 1A 372.8 SqYd, Low Slump Dense Concrete Bridge Deck Overlay 20.2 CuYd, Steel Bridge Railing 280 Ft, Guardrail Installation, Traffic Control, Erosion Control and other various bid items.
Posted Date
Oct 23, 2025
Due Date
Nov 5, 2025
Release: Oct 23, 2025
Close: Nov 5, 2025
The Project consists of constructing approx Base Course 52.6 Ton, Asphalt Concrete Composite 59.2 Ton, Concrete Removal Type 1A 372.8 SqYd, Low Slump Dense Concrete Bridge Deck Overlay 20.2 CuYd, Steel Bridge Railing 280 Ft, Guardrail Installation, Traffic Control, Erosion Control and other various bid items.
Purchase of Maintenance Vehicle.
Posted Date
Aug 30, 2025
Due Date
Sep 9, 2025
Release: Aug 30, 2025
Close: Sep 9, 2025
Purchase of Maintenance Vehicle.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis