Discover Opportunities months before the RFP drops
Learn more →Converting an existing dam into a rock riffle structure, removing the concrete lock, replacing box culverts, and performing associated roadway improvements. Work includes, 1,296 CY of Common Excavation (EV); 855 CY of Common Embankment Type S5 (CV); 2,380 SY of Topsoil Import; 11,050 TON of Aggregate Mix for Class IV & V Riprap; 2,970 TON of Aggregate Mix for Class II Riprap. See outside link.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Converting an existing dam into a rock riffle structure, removing the concrete lock, replacing box culverts, and performing associated roadway improvements. Work includes, 1,296 CY of Common Excavation (EV); 855 CY of Common Embankment Type S5 (CV); 2,380 SY of Topsoil Import; 11,050 TON of Aggregate Mix for Class IV & V Riprap; 2,970 TON of Aggregate Mix for Class II Riprap. See outside link.
Available615 LF remove fence; 14,724 SY geogrid; 340 CY - excavation - common; 4,223 CY clay fill embankment (CV); 10,813 CY select granular embankment (CV); 1,864 CY topsoil import; 610 CY aggregate surfacing (CV) class 5; 182 CY coarse aggregate bedding (cv); 692 CY structure excavation.
Posted Date
Sep 26, 2025
Due Date
Oct 20, 2025
Release: Sep 26, 2025
Close: Oct 20, 2025
615 LF remove fence; 14,724 SY geogrid; 340 CY - excavation - common; 4,223 CY clay fill embankment (CV); 10,813 CY select granular embankment (CV); 1,864 CY topsoil import; 610 CY aggregate surfacing (CV) class 5; 182 CY coarse aggregate bedding (cv); 692 CY structure excavation.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis