Discover Opportunities months before the RFP drops
Learn more →Worker's compensation insurance coverage.
Posted Date
Nov 12, 2025
Due Date
Jan 6, 2026
Release: Nov 12, 2025
Close: Jan 6, 2026
Worker's compensation insurance coverage.
AvailableSite Work: Labor and equipment to complete the site work and bring grade to within 6" of the final and to 95% compaction on the infield and within 2"on the outfield. Stock pile any spoils to be used for backfill around final construction. Custom Poles: 10" black steel back stop poles primed, approximately 42' total with 5'buried inconcrete and 37' exposed for netting. Back Stop Cable System: 36oz netting, cables, ratchets and all needed components and support system for the backstop netting. Dugouts: Construction of two 8'x24' dugouts with fence on all sides and one opening for access the field and metal roofs on each. Concrete Work: Concrete flat work at 4" minimum thickness. Dugouts and bleacher areas. Portable Bleachers: Two portable bleachers for seating upto150. Fence: 6 ft vinyl coated chain link fence withtop rail only, bottom tension wire and posts on 10 ft centers. Infield Blend: Blend of 72% sand, 12% silt, 16% clay. Red Warning Track: Red warning track material for outfield uses only. Outfield Sod: RTF water saver tall fescue.
Posted Date
Sep 24, 2025
Due Date
Oct 3, 2025
Release: Sep 24, 2025
Close: Oct 3, 2025
Site Work: Labor and equipment to complete the site work and bring grade to within 6" of the final and to 95% compaction on the infield and within 2"on the outfield. Stock pile any spoils to be used for backfill around final construction. Custom Poles: 10" black steel back stop poles primed, approximately 42' total with 5'buried inconcrete and 37' exposed for netting. Back Stop Cable System: 36oz netting, cables, ratchets and all needed components and support system for the backstop netting. Dugouts: Construction of two 8'x24' dugouts with fence on all sides and one opening for access the field and metal roofs on each. Concrete Work: Concrete flat work at 4" minimum thickness. Dugouts and bleacher areas. Portable Bleachers: Two portable bleachers for seating upto150. Fence: 6 ft vinyl coated chain link fence withtop rail only, bottom tension wire and posts on 10 ft centers. Infield Blend: Blend of 72% sand, 12% silt, 16% clay. Red Warning Track: Red warning track material for outfield uses only. Outfield Sod: RTF water saver tall fescue.
Snow removal for the 2025-2026 school year, with the option to renew annually, at the sole discretion of the District.
Posted Date
Sep 10, 2025
Due Date
Oct 15, 2025
Release: Sep 10, 2025
Close: Oct 15, 2025
Snow removal for the 2025-2026 school year, with the option to renew annually, at the sole discretion of the District.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis