Discover Opportunities months before the RFP drops
Learn more →2025 small works roster.
Posted Date
Jan 30, 2025
Due Date
Dec 31, 2025
Release: Jan 30, 2025
Close: Dec 31, 2025
2025 small works roster.
AvailableProcure and install a Hydrogen storage and 100 KW fuel cell generation system at the 13.2 kV Substation. The purpose of this project is to prove the concept of fuel cell integration with the utility grid and the viability of long term hydrogen storage. The system will integrate with the Utility grid through a 277/480 grounded wye electrical connection.
Posted Date
Jan 17, 2025
Due Date
Jan 30, 2025
Release: Jan 17, 2025
Close: Jan 30, 2025
Procure and install a Hydrogen storage and 100 KW fuel cell generation system at the 13.2 kV Substation. The purpose of this project is to prove the concept of fuel cell integration with the utility grid and the viability of long term hydrogen storage. The system will integrate with the Utility grid through a 277/480 grounded wye electrical connection.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis