Discover Opportunities months before the RFP drops
Learn more →Boiler Replacement.
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
Boiler Replacement.
AvailableGeneral description of the project is an existing air-cooled chiller and associated pump is to be demolished and replaced. Existing piping is to be connected to a new chiller and pumps. New direct digital controls will replace the existing and controls at the air handling unit and fan coil unit. Existing chilled water piping, and electrical feeds will be modified to accommodate the new equipment. The existing ceilings shall be removed and reinstalled as required for the mechanical and electrical work associated with the project.
Posted Date
Feb 6, 2025
Due Date
Mar 11, 2025
Release: Feb 6, 2025
Close: Mar 11, 2025
General description of the project is an existing air-cooled chiller and associated pump is to be demolished and replaced. Existing piping is to be connected to a new chiller and pumps. New direct digital controls will replace the existing and controls at the air handling unit and fan coil unit. Existing chilled water piping, and electrical feeds will be modified to accommodate the new equipment. The existing ceilings shall be removed and reinstalled as required for the mechanical and electrical work associated with the project.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis