Discover Opportunities months before the RFP drops
Learn more →Perform Construction and Program Management Services, as needed and directed by the District, for its Bond Program projects and other projects as needed and directed by District.
Posted Date
Oct 10, 2025
Due Date
Nov 7, 2025
Release: Oct 10, 2025
Close: Nov 7, 2025
Perform Construction and Program Management Services, as needed and directed by the District, for its Bond Program projects and other projects as needed and directed by District.
The proposed project will include the complete demolition of all existing buildings, site improvements and existing utilities and the construction of three new building structures and all new site improvements.The first building is one (1) new 9,400 SF single story Transportation Building which will house bus & vehicle service bays within ground lifts, a bus washing bay, fluid storage, tire repair, and parts storage.The proposed new building will include office space and tool storage. The proposed Transportation Building will be designed utilizing a pre-engineered metal building shell with convention construction interior improvement.The second building will be a new 10,900 SF single story Warehouse building will include a high-volume warehouse storage area with high bay racks, freezer and cooler box storage, and exterior loading dock and staging area.The proposed building will also include office space and print shop. The proposed Warehouse Building will be designed utilizing a combination of pre-engineered metal building shell and conventional construction with convention construction interior improvements.The final structure is a new 10,900 SF single-story Maintenance & Operations center that include department specific shops and support office space.The proposed Maintenance & Operations Building will be designed utilized a pre-engineered building shell with convention interior construction. The proposed project site improvements will also include all new wet and dry utilities, new paving, and striping, fencing, landscaping and irrigation, and off-site driveway improvements.
Posted Date
-
Due Date
Aug 21, 2025
Close: Aug 21, 2025
The proposed project will include the complete demolition of all existing buildings, site improvements and existing utilities and the construction of three new building structures and all new site improvements.The first building is one (1) new 9,400 SF single story Transportation Building which will house bus & vehicle service bays within ground lifts, a bus washing bay, fluid storage, tire repair, and parts storage.The proposed new building will include office space and tool storage. The proposed Transportation Building will be designed utilizing a pre-engineered metal building shell with convention construction interior improvement.The second building will be a new 10,900 SF single story Warehouse building will include a high-volume warehouse storage area with high bay racks, freezer and cooler box storage, and exterior loading dock and staging area.The proposed building will also include office space and print shop. The proposed Warehouse Building will be designed utilizing a combination of pre-engineered metal building shell and conventional construction with convention construction interior improvements.The final structure is a new 10,900 SF single-story Maintenance & Operations center that include department specific shops and support office space.The proposed Maintenance & Operations Building will be designed utilized a pre-engineered building shell with convention interior construction. The proposed project site improvements will also include all new wet and dry utilities, new paving, and striping, fencing, landscaping and irrigation, and off-site driveway improvements.
Consist of the construction of concrete foundations, infrastructure, right of way work (sewer, water, fire water and sidewalks) and utility systems to support ten (10) prefabricated building. Includes the abatement and demolition of four (4) existing buildings, as well as the removal of one (1) existing modular building. Additionally, the full renovation of one (1) existing multipurpose building. Site improvements consist of new playfields, hardscape flatwork, permanent fencing, gates, landscaping, playgrounds, fabric shade structures, associated retaining walls, exterior stairs and ramps required for elevation transitions.
Posted Date
-
Due Date
Oct 28, 2025
Close: Oct 28, 2025
Consist of the construction of concrete foundations, infrastructure, right of way work (sewer, water, fire water and sidewalks) and utility systems to support ten (10) prefabricated building. Includes the abatement and demolition of four (4) existing buildings, as well as the removal of one (1) existing modular building. Additionally, the full renovation of one (1) existing multipurpose building. Site improvements consist of new playfields, hardscape flatwork, permanent fencing, gates, landscaping, playgrounds, fabric shade structures, associated retaining walls, exterior stairs and ramps required for elevation transitions.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis