Learn more →Glade reservoir main embankment - new off-channel reservoir with an active storage capacity of 170,000 acre-feet includes: approx., 300' high, 20 million cubic yard, zoned earth-rockfill embankment dam with an approx., 5,000' long crest, excavated and lined forebay with a storage capacity of 500 acre-feet, spillway, high-level outlet works, low-level outlet works, and other appurtenances. Munroe canal bypass - concrete encasement and burial of a 102 diameter steel pipeline to convey an existing canal under the proposed glade reservoir. Glade pump plant - pumping facilities with vertical centrifugal pumps to pump water from the forebay into the reservoir.
Posted Date
Nov 26, 2025
Due Date
Dec 15, 2025
Release: Nov 26, 2025
Close: Dec 15, 2025
Glade reservoir main embankment - new off-channel reservoir with an active storage capacity of 170,000 acre-feet includes: approx., 300' high, 20 million cubic yard, zoned earth-rockfill embankment dam with an approx., 5,000' long crest, excavated and lined forebay with a storage capacity of 500 acre-feet, spillway, high-level outlet works, low-level outlet works, and other appurtenances. Munroe canal bypass - concrete encasement and burial of a 102 diameter steel pipeline to convey an existing canal under the proposed glade reservoir. Glade pump plant - pumping facilities with vertical centrifugal pumps to pump water from the forebay into the reservoir.
AvailableLand surveying services.
Posted Date
Oct 9, 2025
Due Date
Oct 30, 2025
Release: Oct 9, 2025
Close: Oct 30, 2025
Land surveying services.
CM/GC will bring resources and expertise to the inlet package, specifically including preconstruction and planning expertise related to: safety. Site access, layout and development. Construction methods, sequencing and coordination. Large canals. Tunneling. River diversions. Complex structural concrete and hydraulic structures. Traffic control. Cm/gc project delivery. Risk management. Innovation to reduce cost, improve quality, shorten construction time, and/or reduce impacts to the public and the environment; and project cost control.
Posted Date
Aug 21, 2025
Due Date
Oct 15, 2025
Release: Aug 21, 2025
Close: Oct 15, 2025
CM/GC will bring resources and expertise to the inlet package, specifically including preconstruction and planning expertise related to: safety. Site access, layout and development. Construction methods, sequencing and coordination. Large canals. Tunneling. River diversions. Complex structural concrete and hydraulic structures. Traffic control. Cm/gc project delivery. Risk management. Innovation to reduce cost, improve quality, shorten construction time, and/or reduce impacts to the public and the environment; and project cost control.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis