Learn more →Work includes approx 52,100 SY temporary seeding, fertilizing and mulching; 3,000 SY profile milling asphalt pavement; 1,500 CY unclassified excavation; 1,500 LF 24" polypropylene storm pipe; 5,300 LF cleaning and televising pipe greater than 8"; 15 EA type A structure -drainage inlet (aircraft loaded); 1,000 LF 8" PVC sanitary sewer pipe; 300 Lf 2" schedule 80 HDPE conuit by directional bore. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 13, 2026
Release: Nov 17, 2025
Close: Jan 13, 2026
Work includes approx 52,100 SY temporary seeding, fertilizing and mulching; 3,000 SY profile milling asphalt pavement; 1,500 CY unclassified excavation; 1,500 LF 24" polypropylene storm pipe; 5,300 LF cleaning and televising pipe greater than 8"; 15 EA type A structure -drainage inlet (aircraft loaded); 1,000 LF 8" PVC sanitary sewer pipe; 300 Lf 2" schedule 80 HDPE conuit by directional bore. See outside link.
AvailableWork include rehabilitate the cast in place concrete tunnel walls for the underground section of the track. Crack injection utilizing epoxy for dry cracks. Crack injection utilizing polyurethane for crack with active water leakage. Curtain grouting for high frequency cracks with active water leakage. Isolated grouting for isolated cracks with active water leakage. Repairs of spalled concrete using class d repair. Providing weepholes to address water pressure buildup and divert water to the existing drainage system.
Posted Date
Nov 10, 2025
Due Date
Dec 16, 2025
Release: Nov 10, 2025
Close: Dec 16, 2025
Work include rehabilitate the cast in place concrete tunnel walls for the underground section of the track. Crack injection utilizing epoxy for dry cracks. Crack injection utilizing polyurethane for crack with active water leakage. Curtain grouting for high frequency cracks with active water leakage. Isolated grouting for isolated cracks with active water leakage. Repairs of spalled concrete using class d repair. Providing weepholes to address water pressure buildup and divert water to the existing drainage system.
AvailableProvide services to perform environmental field sampling and laboratory testing.
Posted Date
Nov 7, 2025
Due Date
Dec 4, 2025
Release: Nov 7, 2025
Close: Dec 4, 2025
Provide services to perform environmental field sampling and laboratory testing.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis