Learn more →CSS Modifications No. 3. Including 390 LF of 8" PVC sewer pipe installation; 400 LF of 6" PVC sewer pipe installation; 18 ea PVC Wye for Sewer Lateral Installation; 18 ea PVC Cleanout Installation; 18 ea PVC Inline Trap Installation; 10 VF 4 Foot Diameter Sanitary Manhole; 1 ea Manhole Frame, Grade Rings, and Cover; 780 LF Sewer Main and Laterals; 20 SY Lawn and Open Space; 200 ton Paved Street Base Course 25mm; 500 SY Paved Street Wearing Course 12.5mm; 70 ton PennDOT Paved Street Binder Course 19mm; 50 LF Concrete Curb Replacement; 10 SY Brick Sidewalk Replacement. See attached file.
Posted Date
Oct 28, 2025
Due Date
Dec 17, 2025
Release: Oct 28, 2025
Close: Dec 17, 2025
CSS Modifications No. 3. Including 390 LF of 8" PVC sewer pipe installation; 400 LF of 6" PVC sewer pipe installation; 18 ea PVC Wye for Sewer Lateral Installation; 18 ea PVC Cleanout Installation; 18 ea PVC Inline Trap Installation; 10 VF 4 Foot Diameter Sanitary Manhole; 1 ea Manhole Frame, Grade Rings, and Cover; 780 LF Sewer Main and Laterals; 20 SY Lawn and Open Space; 200 ton Paved Street Base Course 25mm; 500 SY Paved Street Wearing Course 12.5mm; 70 ton PennDOT Paved Street Binder Course 19mm; 50 LF Concrete Curb Replacement; 10 SY Brick Sidewalk Replacement. See attached file.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis