Discover Opportunities months before the RFP drops
Learn more →Provide multiple-year contract for e-rate eligible wide area network (WAN) services.
Posted Date
Nov 7, 2025
Due Date
Dec 16, 2025
Release: Nov 7, 2025
Close: Dec 16, 2025
Provide multiple-year contract for e-rate eligible wide area network (WAN) services.
AvailableProject consists of grind and remove existing asphalt pavement to a depth of 3", approximately 76,000 SF. Install petromat paving fabric to mitigate future surface cracking. Install new hot mix asphalt pavement, 3" thick, over approximately 76,000 SF. Re-stripe all areas to match the existing configuration, including parking stalls, directional arrows, fire lanes, and ADA markings. Retouch parking lot spaces, curbs and directional markings to match existing in two parking lots.
Posted Date
-
Due Date
Jul 14, 2025
Release: -
Close: Jul 14, 2025
Project consists of grind and remove existing asphalt pavement to a depth of 3", approximately 76,000 SF. Install petromat paving fabric to mitigate future surface cracking. Install new hot mix asphalt pavement, 3" thick, over approximately 76,000 SF. Re-stripe all areas to match the existing configuration, including parking stalls, directional arrows, fire lanes, and ADA markings. Retouch parking lot spaces, curbs and directional markings to match existing in two parking lots.
Provide constructability review, value engineering, master scheduling, cost estimating, budgeting, and construction services for the development and construction for the middle school fields and drop-off project. The project consists of the renovation & new construction of track reconstruction, including field events, replacement of natural turf field with synthetic turf field, track perimeter fencing, gates site furnishing improvements and related utility upgrades.
Posted Date
Jun 9, 2025
Due Date
Jul 8, 2025
Release: Jun 9, 2025
Close: Jul 8, 2025
Provide constructability review, value engineering, master scheduling, cost estimating, budgeting, and construction services for the development and construction for the middle school fields and drop-off project. The project consists of the renovation & new construction of track reconstruction, including field events, replacement of natural turf field with synthetic turf field, track perimeter fencing, gates site furnishing improvements and related utility upgrades.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis