Discover Opportunities months before the RFP drops
Learn more →Project will replace interior lighting fixtures, replace exterior lighting fixtures, and install lighting controls.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Project will replace interior lighting fixtures, replace exterior lighting fixtures, and install lighting controls.
AvailableThe purpose of this project is to replace the existing 850kw generator and transfer switch wi=hich as the end of usable life.
Posted Date
Dec 4, 2025
Due Date
Jan 7, 2026
Release: Dec 4, 2025
Close: Jan 7, 2026
The purpose of this project is to replace the existing 850kw generator and transfer switch wi=hich as the end of usable life.
Available3,200 square foot Type II-B facility consisting of storage occupancies. Structure is concrete slab on grade with masonry bearing walls and structural steel roof framing. Construction includes full interior construction, HVAC systems, electrical, telecommunications, and fire protection systems. Site development includes demolition of existing paving materials, additional paving areas for vehicular access, utility extensions, and minor site drainage reconfiguration.
Posted Date
Nov 17, 2025
Due Date
Dec 9, 2025
Release: Nov 17, 2025
Close: Dec 9, 2025
3,200 square foot Type II-B facility consisting of storage occupancies. Structure is concrete slab on grade with masonry bearing walls and structural steel roof framing. Construction includes full interior construction, HVAC systems, electrical, telecommunications, and fire protection systems. Site development includes demolition of existing paving materials, additional paving areas for vehicular access, utility extensions, and minor site drainage reconfiguration.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis