Learn more →Project includes all work and material necessary to remove bridge and build a low water crossing, all associated earthwork, construction of reinforced concrete top and slopes and revetment.
Posted Date
Dec 10, 2025
Due Date
Jan 18, 2026
Release: Dec 10, 2025
Close: Jan 18, 2026
Project includes all work and material necessary to remove bridge and build a low water crossing, all associated earthwork, construction of reinforced concrete top and slopes and revetment.
AvailableRemove existing Steel I-Beam bridge and install 120" x 84'-0 Corrugated Metal Pipe (CMP) roadway culvert. Project includes all work and material necessary to remove bridge superstructure and install new provided CMP, all associated earthwork, construction of reinforced concrete slope collars and revetment.
Posted Date
Jun 11, 2025
Due Date
Jul 14, 2025
Release: Jun 11, 2025
Close: Jul 14, 2025
Remove existing Steel I-Beam bridge and install 120" x 84'-0 Corrugated Metal Pipe (CMP) roadway culvert. Project includes all work and material necessary to remove bridge superstructure and install new provided CMP, all associated earthwork, construction of reinforced concrete slope collars and revetment.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis