Discover Opportunities months before the RFP drops
Learn more →Replace the ceiling tiles on the third floor of the Library. remove existing 2X2 ceiling tile in all designated locations. All black strip/highlight tiles shall remain. All bookcases, desks, etc. with plastic or tarps while working. Existing ceiling grid shall remain. Clean all existing tile grid prior to new tile installation. remove all existing signs, sensors, etc. and reinstall after tile installation. Provide and install new CertainTeed BET 157 Baroque 2X2 tiles. Approx. 7700 will be needed.
Posted Date
Sep 19, 2025
Due Date
Oct 8, 2025
Release: Sep 19, 2025
Close: Oct 8, 2025
Replace the ceiling tiles on the third floor of the Library. remove existing 2X2 ceiling tile in all designated locations. All black strip/highlight tiles shall remain. All bookcases, desks, etc. with plastic or tarps while working. Existing ceiling grid shall remain. Clean all existing tile grid prior to new tile installation. remove all existing signs, sensors, etc. and reinstall after tile installation. Provide and install new CertainTeed BET 157 Baroque 2X2 tiles. Approx. 7700 will be needed.
Hearnes ceiling tile replacement.
Posted Date
Sep 24, 2025
Due Date
Oct 8, 2025
Release: Sep 24, 2025
Close: Oct 8, 2025
Hearnes ceiling tile replacement.
Work includes boiler replacement.
Posted Date
Sep 5, 2025
Due Date
Sep 15, 2025
Release: Sep 5, 2025
Close: Sep 15, 2025
Work includes boiler replacement.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis