Discover Opportunities months before the RFP drops
Learn more →This project consists of approx 2,297 CY of excavation; 384.3 TON of gravel surfacing; 248.3 CY of Box culvert class A45 concrete; 29,218 LBS of reinforcing steel. See outside link.
Posted Date
Oct 9, 2025
Due Date
Oct 29, 2025
Release: Oct 9, 2025
Close: Oct 29, 2025
This project consists of approx 2,297 CY of excavation; 384.3 TON of gravel surfacing; 248.3 CY of Box culvert class A45 concrete; 29,218 LBS of reinforcing steel. See outside link.
Release: Sep 26, 2025
Close: Oct 15, 2025
New sign service body and installation.
This project consists of the removing 80' of 96" pipe culvert, creating a suitable base, reinstalling the 80' of 96" pipe culvert, installing new tie bars, installing new riprap aprons, and re-grading of ditches.
Posted Date
Apr 28, 2025
Due Date
May 7, 2025
Release: Apr 28, 2025
Close: May 7, 2025
This project consists of the removing 80' of 96" pipe culvert, creating a suitable base, reinstalling the 80' of 96" pipe culvert, installing new tie bars, installing new riprap aprons, and re-grading of ditches.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis