Discover Opportunities months before the RFP drops
Learn more →This work is to refurbish 4 columns, demolish 10'x5' concrete pads, 2 concrete steps, concrete footings, 6'x2' ashpalt and roughly 28ft of 1 1?2" steel tubing handrails. Pour new 6/x2/-6"x1' concrete footing, 10'x5' pads at the top, 6'x4' pad at the bottom, and 2 concrete steps. Repair concrete ramp where the handrail was removed. Then install new 1 1/2" stainless steel tubing handrails. See attached file.
Posted Date
Dec 8, 2025
Due Date
Dec 22, 2025
Release: Dec 8, 2025
Close: Dec 22, 2025
This work is to refurbish 4 columns, demolish 10'x5' concrete pads, 2 concrete steps, concrete footings, 6'x2' ashpalt and roughly 28ft of 1 1?2" steel tubing handrails. Pour new 6/x2/-6"x1' concrete footing, 10'x5' pads at the top, 6'x4' pad at the bottom, and 2 concrete steps. Repair concrete ramp where the handrail was removed. Then install new 1 1/2" stainless steel tubing handrails. See attached file.
AvailableThis work will include some concrete work, and installing core drilled steel handrails. See attached file.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
This work will include some concrete work, and installing core drilled steel handrails. See attached file.
AvailableWork includes asphalt milling and replacement of 2" top layer roughly 13,065 SF and concrete work.
Posted Date
Jun 4, 2025
Due Date
Jun 26, 2025
Release: Jun 4, 2025
Close: Jun 26, 2025
Work includes asphalt milling and replacement of 2" top layer roughly 13,065 SF and concrete work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis