Discover Opportunities months before the RFP drops
Learn more →The Massachusetts Water Resources Authority is soliciting contractors to perform rehabilitation work on specified siphon and junction structures, including construction of gravel access roads, selective clearing/tree removal, waterproofing, new structure tops, access hatches and manhole frames/covers, crack repair, interior lining, and passive odor control. The solicitation includes supplying all materials, equipment, labor, and supervision required for the work. Bidding opened on 2025-12-10 and closes on 2026-01-23; bidders are directed to the MWRA supplier portal for full documents and response instructions.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
The Massachusetts Water Resources Authority is soliciting contractors to perform rehabilitation work on specified siphon and junction structures, including construction of gravel access roads, selective clearing/tree removal, waterproofing, new structure tops, access hatches and manhole frames/covers, crack repair, interior lining, and passive odor control. The solicitation includes supplying all materials, equipment, labor, and supervision required for the work. Bidding opened on 2025-12-10 and closes on 2026-01-23; bidders are directed to the MWRA supplier portal for full documents and response instructions.
AvailableThe Massachusetts Water Resources Authority (MWRA) is soliciting bids to perform major overhauls on compressors at the Oxygen Generation Facility, including a Level E overhaul of two main air compressors and a Level C overhaul of the remaining two compressors. The contract term is 730 calendar days and the procurement is a sealed GENERAL BID. The solicitation is posted on the MWRA supplier portal, includes a site visit at Deer Island Treatment Plant (Dec 17, 2025, 10:00am) and requires responders to access attachments and submission instructions via the MWRA portal.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
The Massachusetts Water Resources Authority (MWRA) is soliciting bids to perform major overhauls on compressors at the Oxygen Generation Facility, including a Level E overhaul of two main air compressors and a Level C overhaul of the remaining two compressors. The contract term is 730 calendar days and the procurement is a sealed GENERAL BID. The solicitation is posted on the MWRA supplier portal, includes a site visit at Deer Island Treatment Plant (Dec 17, 2025, 10:00am) and requires responders to access attachments and submission instructions via the MWRA portal.
AvailableThe Massachusetts Water Resources Authority (MWRA) is soliciting bids for the demolition and replacement of two existing make-up air handling units at the Ward Street Headworks Facility. The procurement is a General, sealed bid (USD) requiring all lines and appears to be construction/MEP work rather than a grant. Bidders must access attachments and response instructions via the MWRA supplier portal (attachments indicated but require login).
Posted Date
Dec 10, 2025
Due Date
Jan 7, 2026
Release: Dec 10, 2025
Close: Jan 7, 2026
The Massachusetts Water Resources Authority (MWRA) is soliciting bids for the demolition and replacement of two existing make-up air handling units at the Ward Street Headworks Facility. The procurement is a General, sealed bid (USD) requiring all lines and appears to be construction/MEP work rather than a grant. Bidders must access attachments and response instructions via the MWRA supplier portal (attachments indicated but require login).
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis