Learn more →The project involves the removal and replacement of 1 each 30" tapping sleeve and 1 each 6" isolation valve in 10 separate manhole structures. As well as injection grouting for non-structural infiltration control within 4 of these structures.
Posted Date
Dec 2, 2025
Due Date
Jan 5, 2026
Release: Dec 2, 2025
Close: Jan 5, 2026
The project involves the removal and replacement of 1 each 30" tapping sleeve and 1 each 6" isolation valve in 10 separate manhole structures. As well as injection grouting for non-structural infiltration control within 4 of these structures.
AvailableFerric chloride pump purchases.
Posted Date
Nov 11, 2025
Due Date
Dec 2, 2025
Release: Nov 11, 2025
Close: Dec 2, 2025
Ferric chloride pump purchases.
Project consists of wastewater treatment plant hazardous material assessment. See outside link.
Posted Date
Nov 10, 2025
Due Date
Dec 2, 2025
Release: Nov 10, 2025
Close: Dec 2, 2025
Project consists of wastewater treatment plant hazardous material assessment. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis