Discover Opportunities months before the RFP drops
Learn more →Project consist of grading complete, drainage, erosion control, and all items necessary to complete the project. Work includes approx. 967 TNs graded aggregate base, 115 TN 19 MM recycled asphalt concrete, 20 LF 18" corrugated metal storm drain pipe, 240 LF 18" HDPE storm drain pipe, 2 AC grassing, 750 LF 1" PVC water service, 60 FT PVC casing.
Posted Date
Nov 4, 2025
Due Date
Dec 11, 2025
Release: Nov 4, 2025
Close: Dec 11, 2025
Project consist of grading complete, drainage, erosion control, and all items necessary to complete the project. Work includes approx. 967 TNs graded aggregate base, 115 TN 19 MM recycled asphalt concrete, 20 LF 18" corrugated metal storm drain pipe, 240 LF 18" HDPE storm drain pipe, 2 AC grassing, 750 LF 1" PVC water service, 60 FT PVC casing.
Work includes : application of 24" thermoplastic stop bars, high build paint, flashing beacon stop signs, thermoplastic striping and 2 foot widening on various county roads.
Posted Date
Aug 27, 2025
Due Date
Sep 25, 2025
Release: Aug 27, 2025
Close: Sep 25, 2025
Work includes : application of 24" thermoplastic stop bars, high build paint, flashing beacon stop signs, thermoplastic striping and 2 foot widening on various county roads.
Work includes installation of a 120" aluminized metal 10-gauge pipe 84' long with type 3 rip rap and surge stone treatment on both ends of the pipe as instructed by the engineer. Also, the pipe shall be bedded in type ii backfill material under bottom and extending up 1/3 of the diameter of the pipe. Back fill up the remainder of the pipe may be crushed stone base or dry compacted dirt. Paving shall consist of 8 inches of gab topped with 2" of 19mm asphalt and then a top coat of 12.5mm asphalt.
Posted Date
Aug 13, 2025
Due Date
Sep 15, 2025
Release: Aug 13, 2025
Close: Sep 15, 2025
Work includes installation of a 120" aluminized metal 10-gauge pipe 84' long with type 3 rip rap and surge stone treatment on both ends of the pipe as instructed by the engineer. Also, the pipe shall be bedded in type ii backfill material under bottom and extending up 1/3 of the diameter of the pipe. Back fill up the remainder of the pipe may be crushed stone base or dry compacted dirt. Paving shall consist of 8 inches of gab topped with 2" of 19mm asphalt and then a top coat of 12.5mm asphalt.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis