Learn more →Work includes the complete demolition and removal of the existing masonry smokestack located adjacent to the existing physical plant building. The smokestack is approx 143 feet in height and 16 feet in diameter at the base. Approximately 4 feet of pigeon droppings are present at the base of the stack.
Posted Date
-
Due Date
Oct 8, 2025
Close: Oct 8, 2025
Work includes the complete demolition and removal of the existing masonry smokestack located adjacent to the existing physical plant building. The smokestack is approx 143 feet in height and 16 feet in diameter at the base. Approximately 4 feet of pigeon droppings are present at the base of the stack.