Discover Opportunities months before the RFP drops
Learn more →Lewis and Clark County seeks Statements of Qualifications from engineering firms to develop an MS4 Stormwater Management Plan and program to comply with Montana MPDES permit requirements. Required work includes urbanized-area boundary mapping, a draft Notice of Intent permit application, comprehensive GIS stormwater mapping and interface, a draft SWMP addressing the six federal Minimum Control Measures, sampling/monitoring/reporting plans and SOPs, and ongoing consultation through 2032. Requires civil/environmental engineering and GIS expertise; SOQs limited to 14 single-sided pages and submitted as five hard copies plus one digital PDF on a flash drive.
Posted Date
Nov 29, 2025
Due Date
Jan 5, 2026
Release: Nov 29, 2025
Close: Jan 5, 2026
Lewis and Clark County seeks Statements of Qualifications from engineering firms to develop an MS4 Stormwater Management Plan and program to comply with Montana MPDES permit requirements. Required work includes urbanized-area boundary mapping, a draft Notice of Intent permit application, comprehensive GIS stormwater mapping and interface, a draft SWMP addressing the six federal Minimum Control Measures, sampling/monitoring/reporting plans and SOPs, and ongoing consultation through 2032. Requires civil/environmental engineering and GIS expertise; SOQs limited to 14 single-sided pages and submitted as five hard copies plus one digital PDF on a flash drive.
AvailableSoliciting statements of qualifications (soqs) from qualified engineering firms for professional services needed to develop a municipal separate storm sewer system (ms4) stormwater management plan (swmp) and program components in order to meet the requirements of the pollutant discharge elimination system (mpdes) permit.
Posted Date
-
Due Date
Jan 5, 2026
Release: -
Close: Jan 5, 2026
Soliciting statements of qualifications (soqs) from qualified engineering firms for professional services needed to develop a municipal separate storm sewer system (ms4) stormwater management plan (swmp) and program components in order to meet the requirements of the pollutant discharge elimination system (mpdes) permit.
AvailableRoof and gutter replacement project on the county courthouse. Replacement of low slope, single ply roof system of Section A, Replacement of asphalt shingled roof system of Section B, Replacement of roof edge gutter liner of Section C.
Posted Date
Jul 26, 2025
Due Date
Aug 11, 2025
Release: Jul 26, 2025
Close: Aug 11, 2025
Roof and gutter replacement project on the county courthouse. Replacement of low slope, single ply roof system of Section A, Replacement of asphalt shingled roof system of Section B, Replacement of roof edge gutter liner of Section C.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis