Discover Opportunities months before the RFP drops
Learn more →Supply and install a compatible panel to replace with our current panel and integrate the 3 elevators that will be upgraded. Any electrical work requiring an electrician is to be included in the proposal.
Posted Date
Nov 13, 2025
Due Date
Dec 3, 2025
Release: Nov 13, 2025
Close: Dec 3, 2025
Supply and install a compatible panel to replace with our current panel and integrate the 3 elevators that will be upgraded. Any electrical work requiring an electrician is to be included in the proposal.
Work consists of demolish and remove an existing playground structure, provide and install new playground equipment and concrete picnic tables.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Close: Dec 10, 2025
Work consists of demolish and remove an existing playground structure, provide and install new playground equipment and concrete picnic tables.
Work consists of parking lot improvements, includes 1,185 CY of topsoil stripping and stockpiling - 4" depth; 1,185 CY of topsoil placement - 4" depth; 1,139 CY of unclassified excavation (includes site grading); 730 LF of 24" rcp storm pipe; 620 CY of import fill; remove and reset fence (includes perimeter and internal barb wire fencing).
Posted Date
Nov 3, 2025
Due Date
Nov 21, 2025
Release: Nov 3, 2025
Close: Nov 21, 2025
Work consists of parking lot improvements, includes 1,185 CY of topsoil stripping and stockpiling - 4" depth; 1,185 CY of topsoil placement - 4" depth; 1,139 CY of unclassified excavation (includes site grading); 730 LF of 24" rcp storm pipe; 620 CY of import fill; remove and reset fence (includes perimeter and internal barb wire fencing).
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis