Discover Opportunities months before the RFP drops
Learn more →Perform certain construction manager services (CM services) for modernization projects at multiple school facilities throughout the District. The budget is inclusive of all construction costs, architecture and engineering fees, preconstruction services, and contingencies.
Posted Date
Dec 12, 2025
Due Date
Jan 7, 2026
Release: Dec 12, 2025
Close: Jan 7, 2026
Perform certain construction manager services (CM services) for modernization projects at multiple school facilities throughout the District. The budget is inclusive of all construction costs, architecture and engineering fees, preconstruction services, and contingencies.
AvailableProvide legal services, addressing a broad range of issues related to district operations on an as-needed basis.
Posted Date
Dec 12, 2025
Due Date
Jan 12, 2026
Release: Dec 12, 2025
Close: Jan 12, 2026
Provide legal services, addressing a broad range of issues related to district operations on an as-needed basis.
AvailableThe Work includes building demolition, selective demolition, new building construction, additions and renovation of existing building construction. a. The building construction includes, cast-in-place concrete, structural steel, steel stud framing systems, foundation waterproofing, building insulation, sheet metal flashing and trim, new roofing systems, roof accessories, joint sealants, steel doors and frames, aluminum framed storefronts, door hardware, glass, gypsum board. b. The site construction includes site clearing, water, electric, grading, drainage control, site and building excavation and backfilling, and other site improvements.
Posted Date
Jul 14, 2025
Due Date
Aug 7, 2025
Release: Jul 14, 2025
Close: Aug 7, 2025
The Work includes building demolition, selective demolition, new building construction, additions and renovation of existing building construction. a. The building construction includes, cast-in-place concrete, structural steel, steel stud framing systems, foundation waterproofing, building insulation, sheet metal flashing and trim, new roofing systems, roof accessories, joint sealants, steel doors and frames, aluminum framed storefronts, door hardware, glass, gypsum board. b. The site construction includes site clearing, water, electric, grading, drainage control, site and building excavation and backfilling, and other site improvements.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis