Discover Opportunities months before the RFP drops
Learn more →Hoffman Construction, serving as the CM/GC for Kitsap County, is soliciting sub-bids for the Central Kitsap Treatment Plant Solid and Liquid Hauled Waste Upgrades project (Bid Package – All Work, Phase IIA). The current solicitation emphasizes that only Bid Item #2K (Plumbing, HVAC & BMS) and Bid Item #2P (Process Pipe) are being bid on December 16, 2025, with Washington State licensing and prevailing wage requirements applying. Bid documents are accessed through Hoffman’s SmartInsight public bid portal, and bids are due at 2:00 PM Pacific on December 16, 2025.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Hoffman Construction, serving as the CM/GC for Kitsap County, is soliciting sub-bids for the Central Kitsap Treatment Plant Solid and Liquid Hauled Waste Upgrades project (Bid Package – All Work, Phase IIA). The current solicitation emphasizes that only Bid Item #2K (Plumbing, HVAC & BMS) and Bid Item #2P (Process Pipe) are being bid on December 16, 2025, with Washington State licensing and prevailing wage requirements applying. Bid documents are accessed through Hoffman’s SmartInsight public bid portal, and bids are due at 2:00 PM Pacific on December 16, 2025.
AvailablePrincipal elements include: Attendant building; limited household hazardous waste (LLHW) building (optional bid item); new refuse shed building A; rehabilitate refuse shed buildings B, C, D (optional bid item); operator warming station; storage building; and site work and frontage improvements.
Posted Date
Oct 29, 2025
Due Date
Dec 16, 2025
Release: Oct 29, 2025
Close: Dec 16, 2025
Principal elements include: Attendant building; limited household hazardous waste (LLHW) building (optional bid item); new refuse shed building A; rehabilitate refuse shed buildings B, C, D (optional bid item); operator warming station; storage building; and site work and frontage improvements.
AvailableImprove 21 signalized intersections in the Silverdale Urban Growth Area with installation of code green signal timing technology.
Posted Date
Oct 28, 2025
Due Date
Nov 18, 2025
Release: Oct 28, 2025
Close: Nov 18, 2025
Improve 21 signalized intersections in the Silverdale Urban Growth Area with installation of code green signal timing technology.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis