Learn more →Remove the existing planter boxes at the main entrance to install additional site paving; Remodel the existing main entrance to a secure entrance vestibule; Relocate the main office and principal's office within the existing main office area; Related mechanical and electrical work. Norway Intermediate — Remodel the existing main entrance to a secure entrance vestibule; Relocate the main office and principal's office within the existing main office area; Replace the exterior windows in the office and nurse's office; Renovate the existing nurse's office; Related mechanical and electrical work. Benton Middle/High School — Remodel entrance 2 into a secure main entrance vestibule; Convert the fine arts storage into an office; Related mechanical and electrical work.
Posted Date
-
Due Date
Apr 10, 2025
Release: -
Close: Apr 10, 2025
Remove the existing planter boxes at the main entrance to install additional site paving; Remodel the existing main entrance to a secure entrance vestibule; Relocate the main office and principal's office within the existing main office area; Related mechanical and electrical work. Norway Intermediate — Remodel the existing main entrance to a secure entrance vestibule; Relocate the main office and principal's office within the existing main office area; Replace the exterior windows in the office and nurse's office; Renovate the existing nurse's office; Related mechanical and electrical work. Benton Middle/High School — Remodel entrance 2 into a secure main entrance vestibule; Convert the fine arts storage into an office; Related mechanical and electrical work.
Proposals to decommission and recycle the 13-year-old 2. 5-megawatt clipper c96 wind turbine.
Posted Date
Mar 9, 2025
Due Date
Apr 10, 2025
Release: Mar 9, 2025
Close: Apr 10, 2025
Proposals to decommission and recycle the 13-year-old 2. 5-megawatt clipper c96 wind turbine.
Work includes 191 CY topsoil on site; 333 CY excavation class 10; 1,567 SY subgrade preparation 12"; 1,589 SY subbase, granular 6"; 1 LS compaction testing; 354 LF subdrain class B type 1 6"; 1 EA subdrain cleanout type A-1 6"; 2 EA subdrain outlets and connections 6"; 1 EA manhole SW401 48"; 1 EA manhole SW-401 60"; 1 EA intake SW-507; 1 EA intake SW-508; 1 EA intake SW-509; 1 EA remove manhole; 3EA remove intake; 94 SY pavement PCC C-SUD 7"; 1,232 SY pavement PCC C-SUD 9"; 101 LF curb and gutter C-SUD 2.5', 9"; 153 SY removal of sidewalk; 163 SY sidewalk PCC C-SUD 6". See outside link.
Posted Date
Feb 21, 2025
Due Date
Mar 25, 2025
Release: Feb 21, 2025
Close: Mar 25, 2025
Work includes 191 CY topsoil on site; 333 CY excavation class 10; 1,567 SY subgrade preparation 12"; 1,589 SY subbase, granular 6"; 1 LS compaction testing; 354 LF subdrain class B type 1 6"; 1 EA subdrain cleanout type A-1 6"; 2 EA subdrain outlets and connections 6"; 1 EA manhole SW401 48"; 1 EA manhole SW-401 60"; 1 EA intake SW-507; 1 EA intake SW-508; 1 EA intake SW-509; 1 EA remove manhole; 3EA remove intake; 94 SY pavement PCC C-SUD 7"; 1,232 SY pavement PCC C-SUD 9"; 101 LF curb and gutter C-SUD 2.5', 9"; 153 SY removal of sidewalk; 163 SY sidewalk PCC C-SUD 6". See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis