Discover Opportunities months before the RFP drops
Learn more →Qualifications from property management firms for inclusion in an existing roster that may be used to select property management services as needed. Include, but are not limited to: residential and/or commercial leases and leasing alternatives; operating and reserve budget preparation; application, occupancy, waiting list, rules and operating policy alternatives; participation of the partnership in community owner's association and any other management issues; and capital project management.
Posted Date
Oct 1, 2025
Due Date
Apr 1, 2026
Release: Oct 1, 2025
Close: Apr 1, 2026
Qualifications from property management firms for inclusion in an existing roster that may be used to select property management services as needed. Include, but are not limited to: residential and/or commercial leases and leasing alternatives; operating and reserve budget preparation; application, occupancy, waiting list, rules and operating policy alternatives; participation of the partnership in community owner's association and any other management issues; and capital project management.
AvailableProvide general contracting for HVAC improvements at the 39-unit Eastridge House apartments. The proposed scope of work (SOW) involves the removal and replacement (new) of all electric heaters in the corridors, elevator lobbies, community room, laundry rooms, select storage rooms, public men's room and all other locations per the drawings. All new wiring must be concealed behind Gypsum Wall Board (GWB) or in KCHA-approved line hide, wire mold, or cover. There may be variations in the layout from the plan depictions, and it is the Contractor's responsibility to verify actual conditions. The Contractor is to carry a contingency in their bid proposal accounting for variations and will be responsible for all wiring, HVAC installation, routing, connections, testing, commissioning, balancing and restoration of the interior and exterior finishes or areas affected by the work. Contractor will not be entering apartments for this project.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Provide general contracting for HVAC improvements at the 39-unit Eastridge House apartments. The proposed scope of work (SOW) involves the removal and replacement (new) of all electric heaters in the corridors, elevator lobbies, community room, laundry rooms, select storage rooms, public men's room and all other locations per the drawings. All new wiring must be concealed behind Gypsum Wall Board (GWB) or in KCHA-approved line hide, wire mold, or cover. There may be variations in the layout from the plan depictions, and it is the Contractor's responsibility to verify actual conditions. The Contractor is to carry a contingency in their bid proposal accounting for variations and will be responsible for all wiring, HVAC installation, routing, connections, testing, commissioning, balancing and restoration of the interior and exterior finishes or areas affected by the work. Contractor will not be entering apartments for this project.
AvailableWork consists of, but is not limited to, the renovation of Building 9 envelope components.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
Work consists of, but is not limited to, the renovation of Building 9 envelope components.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis