Discover Opportunities months before the RFP drops
Learn more →Seeking qualified companies to provide laboratory drug screens for miner certifications and DMS employee testing.
Posted Date
Nov 21, 2025
Due Date
Jan 7, 2026
Release: Nov 21, 2025
Close: Jan 7, 2026
Seeking qualified companies to provide laboratory drug screens for miner certifications and DMS employee testing.
AvailableRemoval of a slide that has occurred behind Mr. Johnsons garage. The slide is pushing up against the garage with about 0.11 acres being disturbed. This will allow enough room to construct a 110 LF permanent debris barrier wall behind the garage. Along with an 80 LF high non-reinforced block wall type 1 that will be located to the side of the barrier wall. Also being installed will be one mine portal wildlife closure that is located next to the slide area and two standard non-wildlife mine portal closures that are in the slide area.
Posted Date
Apr 21, 2025
Due Date
May 14, 2025
Release: Apr 21, 2025
Close: May 14, 2025
Removal of a slide that has occurred behind Mr. Johnsons garage. The slide is pushing up against the garage with about 0.11 acres being disturbed. This will allow enough room to construct a 110 LF permanent debris barrier wall behind the garage. Along with an 80 LF high non-reinforced block wall type 1 that will be located to the side of the barrier wall. Also being installed will be one mine portal wildlife closure that is located next to the slide area and two standard non-wildlife mine portal closures that are in the slide area.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis