Discover Opportunities months before the RFP drops
Learn more →Work includes relocation of approx 400 LF of 36" recycled water (rw) pipeline inside caltrans right-of-way to accommodate the interstate 5 freeway widening. The proposed alignment will place the 36" rw pipeline on the outside southbound lane of culver drive and will maintain 15' of separation from the proposed piles on both sides of the freeway overpass. The proposed work also includes the relocation of two combination air valves.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Work includes relocation of approx 400 LF of 36" recycled water (rw) pipeline inside caltrans right-of-way to accommodate the interstate 5 freeway widening. The proposed alignment will place the 36" rw pipeline on the outside southbound lane of culver drive and will maintain 15' of separation from the proposed piles on both sides of the freeway overpass. The proposed work also includes the relocation of two combination air valves.
AvailableWork includes relocation of approx 400 LF of 36" recycled water (rw) pipeline inside caltrans right-of-way to accommodate the interstate 5 freeway widening. The proposed alignment will place the 36" rw pipeline on the outside southbound lane of culver drive and will maintain 15' of separation from the proposed piles on both sides of the freeway overpass. The proposed work also includes the relocation of two combination air valves.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Work includes relocation of approx 400 LF of 36" recycled water (rw) pipeline inside caltrans right-of-way to accommodate the interstate 5 freeway widening. The proposed alignment will place the 36" rw pipeline on the outside southbound lane of culver drive and will maintain 15' of separation from the proposed piles on both sides of the freeway overpass. The proposed work also includes the relocation of two combination air valves.
AvailableProject involves removal of existing interior coating, repairing and recoating for interior and exterior coating of the two domestic water tanks, replacement of tank inlet, outlet, overflow and drain piping, replacement of storm drain piping and catch basins, replacement and relocation of the flow meter and flow meter vault, and site regarding and repaving. The project will also replace the tank level instrumentation devices, inlet/outlet valves, access manways, interior ladders, and cathodic protection system.
Posted Date
Oct 28, 2025
Due Date
Nov 13, 2025
Release: Oct 28, 2025
Close: Nov 13, 2025
Project involves removal of existing interior coating, repairing and recoating for interior and exterior coating of the two domestic water tanks, replacement of tank inlet, outlet, overflow and drain piping, replacement of storm drain piping and catch basins, replacement and relocation of the flow meter and flow meter vault, and site regarding and repaving. The project will also replace the tank level instrumentation devices, inlet/outlet valves, access manways, interior ladders, and cathodic protection system.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis