Discover Opportunities months before the RFP drops
Learn more →The project consists of a single story, pre-engineered metal building classroom addition of approx 4,860 square feet and an alternate bid single story, pre-engineered wood saw room addition of approx 1,250 SF. The exterior consists of metal wall panel, standing seam metal roof, and aluminum doors and windows. The interior consists of CMU walls, floor coverings, lay-in ceilings, metal stud walls, wood doors with metal frames, fire barrier walls, and complete mechanical and electrical systems.
Posted Date
Nov 27, 2025
Due Date
Dec 18, 2025
Release: Nov 27, 2025
Close: Dec 18, 2025
The project consists of a single story, pre-engineered metal building classroom addition of approx 4,860 square feet and an alternate bid single story, pre-engineered wood saw room addition of approx 1,250 SF. The exterior consists of metal wall panel, standing seam metal roof, and aluminum doors and windows. The interior consists of CMU walls, floor coverings, lay-in ceilings, metal stud walls, wood doors with metal frames, fire barrier walls, and complete mechanical and electrical systems.
AvailableDemolition and removal of the original School buildings in their entirety from school property by August 1, 2025 along with any backfill with engineered fill and compact to 95%.
Posted Date
Jan 22, 2025
Due Date
Feb 10, 2025
Release: Jan 22, 2025
Close: Feb 10, 2025
Demolition and removal of the original School buildings in their entirety from school property by August 1, 2025 along with any backfill with engineered fill and compact to 95%.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis