Discover Opportunities months before the RFP drops
Learn more →Project consists of renovation of approximately 4,000 square feet of high school locker rooms. Facility construction includes concrete slabs & benches, cmu and brick masonry, wood casework, solid surface material, hollow metal and flush wood openings, gypsum board assemblies. Finishes and accessories include tiling, acoustical ceiling tiles, fluid applied flooring, paint, door signage, toilet accessories, metal lockers and wire shelving. Plumbing work includes piping and fixtures. Mechanical work includes air handling unit, energy recovery unit, condensing units. Electrical work includes lighting, power, and fire detection.
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
Project consists of renovation of approximately 4,000 square feet of high school locker rooms. Facility construction includes concrete slabs & benches, cmu and brick masonry, wood casework, solid surface material, hollow metal and flush wood openings, gypsum board assemblies. Finishes and accessories include tiling, acoustical ceiling tiles, fluid applied flooring, paint, door signage, toilet accessories, metal lockers and wire shelving. Plumbing work includes piping and fixtures. Mechanical work includes air handling unit, energy recovery unit, condensing units. Electrical work includes lighting, power, and fire detection.
AvailableWork includes locker room renovations.
Posted Date
Apr 1, 2025
Due Date
Apr 22, 2025
Release: Apr 1, 2025
Close: Apr 22, 2025
Work includes locker room renovations.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis