Discover Opportunities months before the RFP drops
Learn more →Idaho Department of Water Resources requests bids to drill and construct one groundwater monitoring well at Mountain View Park near Moscow, ID. Scope includes mobilization, air‑rotary or dual‑rotary drilling (≥1,070 cfm), 8-inch steel casing and neat cement seal to ~650 ft, 6-inch bore/casing to total depth (up to ~1,200 ft), lockable wellhead, rock‑chip sampling at 10‑ft intervals, required reporting, and per‑foot pricing beyond 650 ft; award to lowest responsive bidder based on total cost for an idealized 1,200‑ft well.
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Idaho Department of Water Resources requests bids to drill and construct one groundwater monitoring well at Mountain View Park near Moscow, ID. Scope includes mobilization, air‑rotary or dual‑rotary drilling (≥1,070 cfm), 8-inch steel casing and neat cement seal to ~650 ft, 6-inch bore/casing to total depth (up to ~1,200 ft), lockable wellhead, rock‑chip sampling at 10‑ft intervals, required reporting, and per‑foot pricing beyond 650 ft; award to lowest responsive bidder based on total cost for an idealized 1,200‑ft well.
AvailableProvide well drilling services.
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Provide well drilling services.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis