Discover Opportunities months before the RFP drops
Learn more →Roof Improvements Project.
Posted Date
Oct 18, 2025
Due Date
Nov 20, 2025
Release: Oct 18, 2025
Close: Nov 20, 2025
Roof Improvements Project.
The work includes the inspection, treatment, and reporting of approx. 4,000 electrical distribution groundline poles by inspection.
Posted Date
Jun 16, 2025
Due Date
Jul 9, 2025
Release: Jun 16, 2025
Close: Jul 9, 2025
The work includes the inspection, treatment, and reporting of approx. 4,000 electrical distribution groundline poles by inspection.
Concrete base excavate 9" material, lay 7" concrete base, 3A32, lay 2" type sp 9.5 course mixture (2,B); bituminous base excavate 4" material, place 2" type 12.5 non wear course mixture (2,B), place 2" type sp 9.5 wear course mixture (2,B); excavate 8" material, lay 4 deg. granular bedding class 5, lay 4"concrete walk; excavate 12" material, lay 6" granular bedding class 5, lay 6" concrete driveway pavement; sod lawn, 2" topsoil, seed & mulch; curb/ gutter restoration; alley repair: 3" bituminous; alley repair: 3: bituminous with concrete base. See outside link.
Posted Date
Apr 16, 2025
Due Date
May 9, 2025
Release: Apr 16, 2025
Close: May 9, 2025
Concrete base excavate 9" material, lay 7" concrete base, 3A32, lay 2" type sp 9.5 course mixture (2,B); bituminous base excavate 4" material, place 2" type 12.5 non wear course mixture (2,B), place 2" type sp 9.5 wear course mixture (2,B); excavate 8" material, lay 4 deg. granular bedding class 5, lay 4"concrete walk; excavate 12" material, lay 6" granular bedding class 5, lay 6" concrete driveway pavement; sod lawn, 2" topsoil, seed & mulch; curb/ gutter restoration; alley repair: 3" bituminous; alley repair: 3: bituminous with concrete base. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis