Discover Opportunities months before the RFP drops
Learn more →Provide artists to design and install a large-scale staircase mural.
Posted Date
Oct 3, 2025
Due Date
Jan 6, 2026
Release: Oct 3, 2025
Close: Jan 6, 2026
Provide artists to design and install a large-scale staircase mural.
AvailableProvide up to 24 original unframed 2d artworks (painting, photography, mixed media) for installation throughout the new mcphl.
Posted Date
Oct 3, 2025
Due Date
Dec 11, 2025
Release: Oct 3, 2025
Close: Dec 11, 2025
Provide up to 24 original unframed 2d artworks (painting, photography, mixed media) for installation throughout the new mcphl.
The office is approx. 9,900 SF with varying scopes of renovation throughout the building. architectural and interior finish work includes, interior selective demolition, new interior wall partitions, interior finishes, casework, doors, and hardware. The MEPT scope of work includes an HVAC replacement and upgrade. Also included is the design of new devices and fixtures for electrical power, lighting, plumbing, and technology to accommodate the new floor plan on the first floor.
Posted Date
Sep 26, 2025
Due Date
Oct 28, 2025
Release: Sep 26, 2025
Close: Oct 28, 2025
The office is approx. 9,900 SF with varying scopes of renovation throughout the building. architectural and interior finish work includes, interior selective demolition, new interior wall partitions, interior finishes, casework, doors, and hardware. The MEPT scope of work includes an HVAC replacement and upgrade. Also included is the design of new devices and fixtures for electrical power, lighting, plumbing, and technology to accommodate the new floor plan on the first floor.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis