Learn more →Sale of $4,925,000 Unlimited Tax Park Bonds, Series 2025.
Posted Date
Nov 14, 2025
Due Date
Nov 24, 2025
Release: Nov 14, 2025
Close: Nov 24, 2025
Sale of $4,925,000 Unlimited Tax Park Bonds, Series 2025.
The work includes replacing the existing step screen with a flex rake and replacing the existing washer & compactor within the WWTF. Actuators are to be installed on the telescoping valves at clarifiers and thickener. Electrical adjustments/additions per the plans. Switch the locations of the check valves and plug valves at clarifier no. 3.
Posted Date
Aug 22, 2025
Due Date
Sep 15, 2025
Release: Aug 22, 2025
Close: Sep 15, 2025
The work includes replacing the existing step screen with a flex rake and replacing the existing washer & compactor within the WWTF. Actuators are to be installed on the telescoping valves at clarifiers and thickener. Electrical adjustments/additions per the plans. Switch the locations of the check valves and plug valves at clarifier no. 3.
Installing two fill lines into the ground storage tanks for future surface water, including LAS chemicals to treat the water and a sidewalk to the future metering station includes 56 SY provide & install prop. 4.5" concrete sidewalk W/subgrade, 1 LS Provide & Install 12" DIP Surface Fill Line into Exist.GSTs. Includes all Appurtenances & Fittings, 1 EA: Provide & Install Static Mixer in Prop. 12" Surface Water Fill Line, 1 EA Provide & Install Static Mixer in Exist. 12" Well Header Piping, 1 EA Provide & Install APCO Air Release Valve No.200A in Exist. 16" Booster Piping., 1 LS Provide and Install LAS Equipment including to Metering Pumps, Double Wall 350 Gallon Storage Tank, Tank Level Indicator, & Appurtenances. Contractor to verify that all Equipment, including Storage tank, can be Delivered & Installed through Prop. Door Openings, 1 EA Provide & Install 1" PVC CL2 Line to Future Surface Metering Station, 1 EA Relocate Exist. 1" PVC CL2 Injection Point on Well Header Piping, 1 EA Provide & Install 1" PVC LAS Line to Future Surface Metering Station, 1 EA Provide & Install 1" PVC LAS Injection Line Into Exist. Well Header Piping, 1 LS System Programming and SCADA applications development and implementation per Section 13325 - System Programming.
Posted Date
Jul 18, 2025
Due Date
Aug 1, 2025
Release: Jul 18, 2025
Close: Aug 1, 2025
Installing two fill lines into the ground storage tanks for future surface water, including LAS chemicals to treat the water and a sidewalk to the future metering station includes 56 SY provide & install prop. 4.5" concrete sidewalk W/subgrade, 1 LS Provide & Install 12" DIP Surface Fill Line into Exist.GSTs. Includes all Appurtenances & Fittings, 1 EA: Provide & Install Static Mixer in Prop. 12" Surface Water Fill Line, 1 EA Provide & Install Static Mixer in Exist. 12" Well Header Piping, 1 EA Provide & Install APCO Air Release Valve No.200A in Exist. 16" Booster Piping., 1 LS Provide and Install LAS Equipment including to Metering Pumps, Double Wall 350 Gallon Storage Tank, Tank Level Indicator, & Appurtenances. Contractor to verify that all Equipment, including Storage tank, can be Delivered & Installed through Prop. Door Openings, 1 EA Provide & Install 1" PVC CL2 Line to Future Surface Metering Station, 1 EA Relocate Exist. 1" PVC CL2 Injection Point on Well Header Piping, 1 EA Provide & Install 1" PVC LAS Line to Future Surface Metering Station, 1 EA Provide & Install 1" PVC LAS Injection Line Into Exist. Well Header Piping, 1 LS System Programming and SCADA applications development and implementation per Section 13325 - System Programming.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis