Discover Opportunities months before the RFP drops
Learn more →The Harris County Flood Control District issued an Invitation to Bid for major repairs to Brays Bayou (Project ID D100-00-00-X134) to enhance flood control infrastructure and public facility integrity. The contract covers site construction, traffic control, concrete sidewalks, chain link fences and gates, and other related work to be performed in accordance with HCFCD and City of Houston specifications.
Posted Date
-
Due Date
Dec 22, 2025
Close: Dec 22, 2025
The Harris County Flood Control District issued an Invitation to Bid for major repairs to Brays Bayou (Project ID D100-00-00-X134) to enhance flood control infrastructure and public facility integrity. The contract covers site construction, traffic control, concrete sidewalks, chain link fences and gates, and other related work to be performed in accordance with HCFCD and City of Houston specifications.
AvailableQualifications-Based Selection (RFSQ) to prequalify firms for on-call construction engineering and inspection services in support of the Harris County Flood Control District. The solicitation requests prequalification for firms to provide construction inspection and associated construction engineering services as needed.
Posted Date
Oct 24, 2025
Due Date
Nov 24, 2025
Release: Oct 24, 2025
Close: Nov 24, 2025
Qualifications-Based Selection (RFSQ) to prequalify firms for on-call construction engineering and inspection services in support of the Harris County Flood Control District. The solicitation requests prequalification for firms to provide construction inspection and associated construction engineering services as needed.
The work includes approx 1 ls mob / demob and utility clearance; 3 per crew day advance 10 soil borings to ~20 feet bgs. Dpt rig, operator & helper; 3 per crew day install 10 temporary monitoring wells. Equipment, operator, well supplies, pump and tubing, per diem, fuel, etc.
Posted Date
May 8, 2025
Due Date
May 21, 2025
Release: May 8, 2025
Close: May 21, 2025
The work includes approx 1 ls mob / demob and utility clearance; 3 per crew day advance 10 soil borings to ~20 feet bgs. Dpt rig, operator & helper; 3 per crew day install 10 temporary monitoring wells. Equipment, operator, well supplies, pump and tubing, per diem, fuel, etc.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis