Discover Opportunities months before the RFP drops
Learn more →This project comprises the construction of an addition to the existing building. Construction includes a three-story structure with a sallyport on the south end and three cast-in-place retaining walls. Based on the results of the drilling program, laboratory testing, and engineering analyses, the site is suitable for supporting the proposed building addition.
Posted Date
May 28, 2025
Due Date
Jun 19, 2025
Release: May 28, 2025
Close: Jun 19, 2025
This project comprises the construction of an addition to the existing building. Construction includes a three-story structure with a sallyport on the south end and three cast-in-place retaining walls. Based on the results of the drilling program, laboratory testing, and engineering analyses, the site is suitable for supporting the proposed building addition.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis